This SCADA project was awarded to Wellington Power Corporation on July 16, 2013, in the amount of $13,880,000.  After change orders and essentials paid to various vendors to make the system complete, the total project cost was $13,898,424.

The scope of this project consisted of the installation of a new Sign Control and Data Acquisition System (SCADA)  at the Chesapeake Bay Bridge and Tunnel (CBBT). The SCADA system project included the furnishing and installation of new equipment as well as the upgrading of existing equipment throughout the CBBT facility. This included the installation of new devices, cable and raceway on and around the parallel Northbound and Southbound elevated structures, two tunnels, four ventilation buildings, at-grade roadways and two Toll Plazas. This project spanned the entire facility and was completed on May 12, 2015.