Shown is the Southeast side of the Upper Truss of North Channel Bridge Northbound.

Shown is the Southeast side of the Upper Truss of North Channel Bridge Northbound.

North Channel Bridge, North and South; Fisherman Inlet Bridge, North and South; Trestle Steel Spans, Fishing Pier Steel Span and Little Creek Finger Pier

The bridge-painting project was awarded in September 2011 to SAFFO Contractors, Inc. of Wilmington, NC, in the amount of $7,750,000.

This project consisted of the surface preparation and painting of all existing structural steel at the following locations: North and southbound North Channel Bridge, north and southbound Fisherman Inlet Bridge; Trestle Steel Spans; the Fishing Pier located on #1 Island and the Steel Span of the Little Creek Pier.

This project was completed on October 2, 2013.